We proudly announce the inclusion of Consumer Corner β€” helping consumers estimate bills, check duplicate bills, and save energy. Follow our YouTube channel for more tips!
Header β€” fixed arrow

πŸ”§ 11kV Feeder Hosting Capacity Analyzer

Measure hosting capacity on 11kV distribution feeders using Synergi Electric MDB files and assess DER hosting with random population

πŸ”„ Connecting...

Loading Hosting Capacity Analyzer...

This may take a few seconds

πŸ’‘ Troubleshooting Tips:

  • If loading fails: Click "Open in New Tab" for direct access
  • For downloads: Use the direct link for best compatibility
  • Browser issues: Try disabling ad blockers or use a different browser
  • Network problems: Check your internet connection and retry

11kV Feeder Hosting Capacity Analyzer

Web-based tool to analyze hosting capacity on 11kV distribution feeders using Synergi Electric MDB files. Perform load flow and DER hosting capacity analysis without installation. Compatible with all Pakistani distribution networks.

About the Hosting Capacity Analyzer

This tool analyzes the hosting capacity of 11kV distribution feeders, enabling utilities to integrate Distributed Energy Resources (DER) like solar or wind without compromising grid stability. It processes Synergi Electric MDB files to perform load flow analysis and assess DER hosting capacity using random placement on 33% of HV buses.

What is Hosting Capacity Analysis?

Hosting capacity analysis determines the maximum amount of DER that a distribution feeder can accommodate without violating voltage, thermal, or power quality constraints. This tool is tailored for 11kV feeders, critical for renewable energy integration in Pakistan’s power distribution networks.

Why It Matters

With increasing renewable energy adoption, understanding DER hosting capacity prevents grid issues like overvoltages or overloads. This tool supports Pakistani utilities (e.g., LESCO, FESCO, MEPCO) in optimizing DER placement for sustainable and reliable power systems.

Key Features

  • No installation required - fully web-based platform.
  • Processes Synergi Electric MDB files for 11kV feeders.
  • Performs automated load flow analysis for baseline performance.
  • Assesses DER hosting capacity with random placement on 33% of HV buses.
  • Compatible with all Pakistani electricity distribution companies’ 11kV networks.
  • Provides real-time results and exportable reports for planning.

Benefits

  • Optimizes renewable energy integration with data-driven DER placement.
  • Reduces grid upgrade costs through accurate capacity insights.
  • Enhances voltage stability and power quality in 11kV feeders.
  • Supports efficient planning for distribution companies in Pakistan.
  • Accessible anywhere, no software setup required.

Methodology

The tool uses a stochastic approach, randomly placing DERs on 33% of High Voltage (HV) buses in the feeder network. It performs:

  1. Load flow analysis using Synergi MDB files to establish baseline conditions.
  2. Iterative DER placement simulations to evaluate impacts.
  3. Assessment of voltage (0.95-1.05 pu), thermal, and power quality constraints.

Results identify the maximum DER capacity while ensuring system reliability.

How to Use

  1. Upload your Synergi Electric MDB file.
  2. Configure DER parameters (type, size, iterations).
  3. Run load flow and hosting capacity analysis.
  4. View and download results for power system planning.

Contact us for support or inquiries about DER integration and hosting capacity analysis.

Scroll to Top