Net Billing in Pakistan: A Distribution Engineer’s Guide to the NEPRA Prosumer Regulations 2026

What changed, which category you are in, how the bill is calculated, and why your DISCO’s transformer and feeder decide how much solar you can connect.

Published: 12 October 2026  |  Author: Engr. Ikram Ullah  |  Regulatory and Engineering Guide
اردو میں پڑھیں ←

The Short Answer

  • The rule: On 9 February 2026 NEPRA notified the Prosumer Regulations 2026 (S.R.O. 251(I)/2026), replacing the 2015 net metering regulations with net billing.
  • How billing works: Units you import are billed at your normal tariff. Units you export are bought by your DISCO at the National Average Energy Purchase Price, reported at roughly Rs 10 to 11 per unit. The two are billed separately, not offset unit for unit.
  • Who qualifies: Clean generation up to 1 MW. New agreements run for five years.
  • Existing net metering holders: A draft amendment proposes to keep their old terms until expiry. I could not confirm that it was finalised, so please verify your own position (see Section 6).
  • The engineering reality: Your DISCO can refuse or limit an application if the transformer or feeder cannot safely absorb your export. Voltage rise, not panels, is usually the binding limit.

Most coverage of the new prosumer rules stops at the buyback rate. That is understandable, because the drop in the export price is what households feel first. But anyone who has worked on a distribution network knows that the export price is only half the story. The other half is whether your feeder and transformer can accept your solar at all, and that is decided by physics and by the DISCO’s technical assessment long before any tariff is applied. This guide covers both halves.

1. What Changed, Side by Side

FeatureNet metering (2015 regulations)Net billing (2026 regulations)
Billing basisExported units offset imported units one for oneImports billed at tariff, exports bought separately, and the two values are netted in rupees
Value of an exported unitReported at roughly Rs 26 to 27 per unitNational Average Energy Purchase Price, reported at roughly Rs 10 to 11 per unit
Contract termSeven yearsFive years, renewable by mutual consent
Size limitDistributed generation under the earlier rulesClean generation up to 1 MW
ApprovalDISCO processDISCO application, then NEPRA concurrence before supply or export

2. How the Bill Is Calculated

At the end of each billing cycle, electricity your DISCO supplied to you is billed at the applicable tariff. Electricity you supplied to the DISCO is valued at the National Average Energy Purchase Price (NAEPP). The two amounts are netted. If your exports are worth more than your imports, the difference is credited to the next billing cycle or paid quarterly. Billing adjustments are made monthly.

Worked Example (illustrative, flat prices, no taxes)

Assume a month in which you import 400 units and export 300 units. Take an import price of Rs 45 per unit and an export price of Rs 11 per unit. Real bills use slabs and taxes, so treat this only as a comparison.

Net billing: imports cost 400 x 45 = Rs 18,000. Exports earn 300 x 11 = Rs 3,300. Net payable is about Rs 14,700.

Old one for one net metering: net import is 400 – 300 = 100 units, costing about Rs 4,500.

The difference, about Rs 10,200 in this month, is the whole story of why self consumption now matters so much. Every unit you use yourself saves the import price. Every unit you export earns roughly a quarter of it.

3. The Buyback Rate, and Why Figures Differ

The NAEPP is the average price at which DISCOs buy energy nationally. Reporting at the time of notification placed it at around Rs 10 to 11 per unit for new prosumers, against about Rs 26 to 27 under the old arrangement. The regulations also allow NEPRA to revise the applicable rate during the term of an agreement by notification, and a revised rate is deemed incorporated into the agreement. That is an important commercial risk: the export price is not locked for five years.

You may see other numbers quoted. A draft published in December 2025 estimated the NAEPP at around Rs 13, and during the public debate a political leader cited a figure of Rs 8.13. These differ because they refer to different dates, drafts or statements. For any financial decision, use the current NAEPP from NEPRA’s latest notification rather than a number from an article, including this one.

4. The Application Journey

  1. Apply to your DISCO. The DISCO must give guidance, supply application documents free of cost, and process the application fairly and in good time.
  2. Technical assessment. The DISCO checks whether your system can be safely interconnected. For larger systems it may carry out technical studies. If interconnection is not feasible, it must tell you why.
  3. Agreement. If approved, you and the DISCO sign an agreement that recognises you as a prosumer.
  4. NEPRA concurrence. Before you supply or export electricity, NEPRA must grant concurrence. If you do not proceed within a reasonable time after concurrence, you may need to apply again. A non-refundable concurrence fee of Rs 1,000 per kilowatt has been reported by Geo News; please confirm the current fee with your DISCO.
  5. Metering. Two way metering is required, either one bidirectional meter or two meters whose combined result matches a single meter. Readings are preferably taken by hand held units or automated systems.
  6. Operation. You must keep voltage and frequency within prescribed limits, install the required protection and provide disconnect switches for emergency isolation. Your DISCO may temporarily disconnect the system if it interferes with the grid or creates a safety risk.

5. The Distribution Engineer’s View

Here is the part that most guides leave out. When a DISCO assesses your application, the question is not only “does this person qualify?” It is “what happens on this transformer and this feeder when this system exports at midday?” The tariff decides whether solar is worthwhile for you. The network decides whether it can be connected.

Why voltage rise is usually the binding limit

A low voltage feeder was designed to carry power from the transformer to the customers, with voltage falling along the way. A solar system reverses that for part of the day. When the system exports, current flows toward the transformer and voltage rises along the feeder, in proportion to the exported power and the resistance of the conductors. The statutory band around the 400 V nominal is 380 V to 420 V, so the upper limit is 420 V.

This links directly to the design mismatch I described in my article on the 415V versus 400V standards. A distribution transformer nameplated at 415 V already starts 15 V above nominal. That leaves only 5 V of room before the 420 V ceiling, and export can consume it quickly.

Illustrative Example: Export at the End of an LV Feeder

Assumptions (simplified): three phase, 400 V, one lumped export of 30 kW at unity power factor at the feeder tail, resistance of 0.15 ohm per phase, no other load, and reactance ignored.

Current is about 30,000 / (1.732 x 400) = 43 A. Voltage rise is about 11 V line to line, which is roughly 0.375 V for every kW exported.

Transformer at 415 V: 415 + 11 = 426 V at the feeder tail, above the 420 V limit. The margin is only 5 V, so about 13 kW of export is the most this feeder tail could take.

Transformer set at 400 V: 400 + 11 = 411 V, comfortably inside the limit. The margin is 20 V, so about 53 kW could be exported before reaching 420 V.

These are not measured values for any real feeder. They show how strongly the base voltage, the conductor resistance and the location of the generation interact.

Illustrative Export Hosting Capacity at the Feeder Tail Same feeder, different transformer base voltage (simplified, not measured data) 0 25 50 about 13 kW 415 V base (5 V margin) about 53 kW 400 V base (20 V margin) Maximum export before the 420 V ceiling is reached
The same feeder can host roughly four times more export when the starting voltage leaves a 20 V margin instead of 5 V. This is why base voltage is a hosting capacity issue, not a paperwork detail.

What else the DISCO checks

  • Transformer loading. Total connected solar on a transformer is compared with its rating, including solar already connected. Reverse loading can heat a transformer just as forward loading does. The check is usually against the transformer’s capacity, and the exact criterion is set by your DISCO, so ask for it.
  • Protection. Fuses and relays on many LV networks were set for power flowing one way. Bidirectional flow and the need to prevent islanding are why disconnect switches and protective equipment are required.
  • Phase balance. A single phase system on an already heavy phase can worsen voltage unbalance for neighbours.
  • Power quality. Inverters add harmonic content, and many together can distort a weak network.
  • Existing connected capacity. Earlier solar on the same transformer uses up headroom first. As I have argued before, on many feeders DER already exceeds 20 percent of the connected transformer kVA.

Why an application can be refused or limited

The regulations say that if interconnection is not feasible the DISCO must tell the applicant the reasons. In engineering terms, the usual grounds are the ones above: the transformer or feeder would exceed its thermal or voltage limits, protection would not coordinate, or the connected capacity on that section is already high. A refusal is not necessarily final. A smaller system, a different phase, or network reinforcement may change the answer.

What you can do to improve your odds

  • Size for self consumption, not for export. A system matched to your daytime use stresses the network less and earns more under net billing.
  • Set an export limit in the inverter at or below your sanctioned capacity and ask your installer to confirm it in writing. Our article on Export MDI shows what happens when this is missed.
  • Spread single phase systems across phases where your connection allows it, and ask whether your inverter supports grid friendly voltage response settings.
  • Ask your DISCO early. Request the transformer’s rating and the solar already connected to it before you buy equipment.

6. If You Already Have Net Metering

This is the question I am asked most. The original notification repealed the 2015 regulations but said agreements signed under them remain valid. It also said existing generators would be billed at the national average power purchase price until their agreement expired, which led many reports to describe an immediate shift to net billing for everyone.

After public and political objection, the Prime Minister directed that existing contracts be safeguarded. NEPRA then issued a draft amendment to regulation 21 on 16 February 2026. It proposes that agreements executed under the repealed regulations remain unaffected, so existing generators keep billing under the old rates and mechanisms until their terms expire, with the change treated as effective from 9 February 2026. Public comments were invited for 30 days.

What I could and could not verify. I confirmed the draft amendment and its content. I could not find the final notified text, so I cannot tell you it is law. Please obtain written confirmation from your DISCO of which terms apply to your agreement, and keep a copy of your signed agreement and recent bills showing how exports are credited.

Reports also suggest that capacity added to an existing system after the cut off date may fall under the new rules even if the original system stays protected. I have seen this in only one secondary source, so treat it as something to check before you expand. When an existing seven year agreement ends, you may request a five year extension, subject to the DISCO’s willingness, and it would then be on net billing terms.

7. Why the Rules Changed, and the Debate

The Power Division told NEPRA that around 0.4 million prosumers, less than one percent of 39 million consumers, imposed a burden of roughly Rs 270 billion in 2026 on consumers without net metering. It projected the burden rising to about Rs 628 billion, or Rs 5.36 per unit, by 2034. The argument is that fixed grid and capacity costs are being shifted onto people who cannot install solar, a mechanism I explained in the battery article.

Critics reply that households invested on the strength of state backed agreements, that buying power at around Rs 11 while selling at Rs 40 or more is unfair, and that the change slows the energy transition. Both positions deserve a hearing. As an engineer, I will add only that an export price which reflects what the grid actually saves also pushes solar toward self consumption and storage, which is easier on feeders than uncoordinated export.

8. A Practical Checklist

  1. Decide your category: new applicant, existing holder, or adding capacity to an existing system.
  2. Get the current NAEPP and your applicable tariff in writing.
  3. Ask your DISCO for the transformer rating and the solar already connected to it.
  4. Size the system for self consumption and set the inverter export limit.
  5. Confirm the concurrence fee and the metering arrangement.
  6. Keep copies of your agreement, concurrence and meter details.
  7. If you hold an older agreement, get written confirmation of your billing terms.

Key Takeaways

  • Net billing separates imports and exports. Exports are valued at the NAEPP, reported at about Rs 10 to 11, against a tariff several times higher.
  • The export price can change during your agreement. Do not build a business case on a number that NEPRA may revise.
  • The network decides what can be connected. Voltage rise and transformer loading often limit capacity before the tariff does.
  • Base voltage matters. The same feeder can host far more export if the starting voltage leaves more margin to 420 V.
  • Existing holders should verify, not assume. The protective amendment I found was a draft, so get written confirmation.
  • Self consumption is the winning strategy for both your bill and the grid.

Frequently Asked Questions

What is net billing in Pakistan?
Net billing is the arrangement under the NEPRA Prosumer Regulations 2026 in which a DISCO bills the electricity it supplies to a solar owner at the normal tariff and buys the surplus the solar owner supplies at the National Average Energy Purchase Price. The two values are netted in rupees, instead of units being offset one for one.
What is the buyback rate under net billing?
Reporting at the time of notification put the NAEPP at roughly Rs 10 to 11 per unit. The rate can be revised by NEPRA during an agreement, and other figures have been quoted in drafts and public statements, so check NEPRA’s current notification.
Do existing net metering consumers keep their old terms?
A NEPRA draft amendment of February 2026 proposes that valid agreements keep their original rates and mechanisms until expiry. I could not confirm that it was finalised, so ask your DISCO for written confirmation.
How long is a net billing agreement?
Five years, renewable by mutual consent of the prosumer and the DISCO.
Can my DISCO reject my solar application?
Yes, if interconnection is not feasible, for example because the transformer or feeder cannot safely absorb the export. The DISCO must tell you the reasons. A smaller system or network reinforcement may change the outcome.
Is solar still worth it under net billing?
For many households it can be, but the return now depends heavily on how much of the solar output you use yourself. Exporting earns far less than importing costs. Our winter article shows how to use surplus solar for loads such as hot water.

Sources Referenced

  1. Business Recorder, “Nepra notifies Prosumer Regulations,” 10 February 2026 brecorder.com
  2. Dawn, “Nepra pulls the plug on net-metering” dawn.com/news/1972203
  3. Geo News, “No more net metering as govt shifts to net billing” geo.tv
  4. The Nation, “Nepra notifies amendment in draft prosumer regulations,” 17 February 2026 nation.com.pk
  5. Profit by Pakistan Today, “How will existing solar net metering users be affected by NEPRA’s new regulations?” profit.pakistantoday.com.pk